Listed-building restoration, renovation and conservation
A listed home carries obligations a general contractor isn’t equipped for:
- Securing listed building consent before work can begin
- Sympathetically working with original fabric that can’t simply be replaced
- Satisfying a conservation officer who expects period-literate work
OLBC — the Oxford & London Building Consultancy — has spent over twenty years on exactly this work: restoring and adapting London’s listed and period houses. Design, conservation, structural engineering and construction are all within one team, with a 100% record on the consents the work depends on.
Speak to a Director about a listed building
What makes listed work different
Restoring a listed building isn’t ordinary construction with extra paperwork — it’s a different discipline. Four things set it apart:
Consent must come first — by law. Listed building consent is a separate legal approval from planning permission, and it must be obtained before any work starts. Altering a listed building without it is a criminal offence, not a planning irregularity. Securing it depends on demonstrating to the conservation officer that the work will be led by people who understand and care for listed buildings — which is why OLBC handles the consent case as a holistic part of the design stage. Our whole design process revolves around what listed building consents may realistically be obtained, which is why we have a 100% record of securing them.
Matching, not replacing. Swapping original fabric for a modern substitute is rarely acceptable. Lime plaster, for example, is made to order by a specialist supplier after analysis of historical samples, and it dries in its own time — the process can’t be accelerated, so the drying period has to be built into the programme. Ornate cornices are often hand-cleaned of decades of overpainting; original four-panelled doors repaired and refurbished; 180-year-old brickwork carefully cleaned rather than replaced. It is not unusual to call on a wide variety of specialist crafts on a single project.
Adapting without erasing. A listed home still has to work for the family living in it. Clumsy alterations often have to be reversed to recover the original sense of the building. That doesn’t mean creature comforts are off the table — we often gain consent for underfloor heating, air conditioning, data, a new lift or a basement gym, by sensitively routing services along established historical paths. The overarching aim is as little disturbance as possible to the historical fabric, and to retain the overall sense and read of the building.
Structural work kept in-house. Period buildings hide their problems. On one project, OLBC’s team traced a sagging first-floor room to a Georgian timber truss quietly cut through by a later doorway and “reinforced” with steel arches that did nothing. To rectify it, the team propped the floors, carefully investigated the source of the failure, and designed a solution to put it right. Underpinning a listed structure, arresting historic movement, carefully forming a basement set beneath the listed walls without disturbing them — this is not work for a general contractor, and OLBC’s own structural teams handle it. We never subcontract these elements.
The team behind the work
Securing listed building consent — and carrying out work that satisfies it — comes down to the people doing it. At OLBC, listed projects are led by the practice’s two principals.
Rosie Caley — Design Director. A graduate of the Architectural Association, where she studied the conservation and preservation of historic buildings. She leads OLBC’s design work and the listed building consent applications it depends on.
Marc Stchedroff — Managing Director. More than twenty years working on historic buildings, with a deep understanding of their structure and their sensitive repair.
Between them, the design knowledge to win consent and the structural knowledge to carry the work out — so restoration and alteration to a period home is done with authenticity, and a Director is personally involved in every listed project. For the consent side specifically, see our planning service.
Listed-building restoration and conservation
A Grade II or Grade II* home carries obligations a general contractor isn’t equipped for:
- Securing listed building consent before work can begin
- Working with original fabric that can’t simply be replaced
- Satisfying a conservation officer who expects period-literate work
OLBC — the Oxford & London Building Consultancy — has spent over twenty years on exactly this work: restoring and adapting London’s listed and period houses. Design, conservation, structural engineering and construction are all in-house, with a 100% record on the consents the work depends on.
Speak to a Director about a listed building
What makes listed work different
Restoring a listed building isn’t ordinary construction with extra paperwork — it’s a different discipline. Four things set it apart:
Consent must come first — by law. Listed building consent is a separate legal approval from planning permission, and it must be obtained before any work starts. Altering a listed building without it is a criminal offence, not a planning irregularity. Securing it depends on demonstrating to the conservation officer that the work will be led by people who understand and care for listed buildings — which is why OLBC handles the consent case as a holistic part of the design stage. Our whole design process revolves around what listed building consents may realistically be obtained, which is why we have a 100% record of securing them.
Matching, not replacing. Swapping original fabric for a modern substitute is rarely acceptable. Lime plaster, for example, is made to order by a specialist supplier after analysis of historical samples, and it dries in its own time — the process can’t be accelerated, so the drying period has to be built into the programme. Ornate cornices are often hand-cleaned of decades of overpainting; original four-panelled doors repaired and refurbished; 180-year-old brickwork carefully cleaned rather than replaced. It is not unusual to call on a wide variety of specialist crafts on a single project.
Adapting without erasing. A listed home still has to work for the family living in it. Clumsy alterations often have to be reversed to recover the original sense of the building. That doesn’t mean creature comforts are off the table — we often gain consent for underfloor heating, air conditioning, data, a new lift or a basement gym, by sensitively routing services along established historical paths. The overarching aim is as little disturbance as possible to the historical fabric, and to retain the overall sense and read of the building.
Structural work kept in-house. Period buildings hide their problems. On one project, OLBC’s team traced a sagging first-floor room to a Georgian timber truss quietly cut through by a later doorway and “reinforced” with steel arches that did nothing. To rectify it, the team propped the floors, carefully investigated the source of the failure, and designed a solution to put it right. Underpinning a listed structure, arresting historic movement, carefully forming a basement set beneath the listed walls without disturbing them — this is not work for a general contractor, and OLBC’s own structural teams handle it. We never subcontract these elements.
The team behind the work
Securing listed building consent — and carrying out work that satisfies it — comes down to the people doing it. At OLBC, listed projects are led by the practice’s two principals.
Rosie Caley — Design Director. A graduate of the Architectural Association, where she studied the conservation and preservation of historic buildings. She leads OLBC’s design work and the listed building consent applications it depends on.
Marc Stchedroff — Managing Director. More than twenty years working on historic buildings, with a deep understanding of their structure and their sensitive repair.
Between them, the design knowledge to win consent and the structural knowledge to carry the work out — so restoration and alteration to a period home is done with authenticity, and a Director is personally involved in every listed project. For the consent side specifically, see our planning service.
Case study — Kensington Gate, W8 (Grade II*)
A returning client approached us before they purchased a very substantial Regency town house on Kensington Gate. When we first viewed it we saw an imposing, but faded shadow of itself after generations of insensitive alterations. It’s unusual Grade II* listing, seemingly mostly for group character, sets the bar very high in terms of both the sensitivity of the design and execution.
- Location: Kensington Gate, W8, Royal Borough of Kensington & Chelsea
- Listing: Grade II*, Queen’s Gate Conservation Area
- Size: 600 m²
- Duration: 18-month build
- Scope: whole-house refurbishment and basement extension
- Contract: JCT Design & Build
- Interior design: Studio OLBC
Consents in under a year. Within six weeks of appointment, OLBC had submitted the first Listed Building Consent applications complete with a thorough heritage assessment of the asset. Every consent the project depended on was secured in less than a year. In a conventional project team — architect, structural engineer, conservation specialist, interior designer and M&E engineers around a table — the same work usually takes months or years to distil into a buildable plan. The difference is having every discipline in-house from the design to the heritage statement enabled them to be seamlessly developed in parallel.
Four plastering crafts on one job. Restoring the Regency interior called on specialist crafts at every stage. Katharina hand-cleaned decades of paint from the ornate cornicing. Phil’s team applied the specially made, after testing the original, lime plaster, which had to dry in its own time. Peter cast some new sections of ornate plasterwork in the workshop from squeezes taken on site. Winston ran in-situ ornate plaster: the way the work was originally done.
Modern comforts, hidden in plain sight. Underfloor heating, air conditioning, structured data, a new lift, a basement gym — all consented and installed without disrupting the historical fabric. The plant for the house was tucked away in a room that had originally held its oil-storage tanks, which the conservation officer was relaxed about repurposing. Services were concealed by routing them along established historical paths.
The result: the most historically authentic house on the square, and a working family home for the 2020s.
See the full Kensington Gate project

Every listed project starts with a Director
The first conversation about a listed home is with one of OLBC’s Directors, not a sales desk. Tell us about the building and what you’re considering — its listing status, the work you have in mind, anything a previous consultant has told you — and we’ll be honest about what’s possible. A Director will be in touch within one working day.